ELECTRICAL POWER INFRASTRUCTURE
Phase 1a (Complete)
500Kw Diesel generator(s) (N+1)
225kVA UPS
51 tons (N+1) Cooling Data Center
180kW (IT Loads) Data Center
3 tons (N) Cooling Electrical Room
6 tons (N+1) Cooling Cross-Connect room
20kW (IT Loads) Cross-Connect Room
Power Utilization Efficiency (PUE) 1.27
Phase 1b
750kVA UPS (N+1)
171 tons (N+1) Cooling Data Center
600kW (IT Loads) Data Center
9 tons (N) Cooling Electrical Room
11 tons (N+1) Cooling Cross-Connect room
40kW (IT Loads) Cross-Connect Room
Power Utilization Efficiency (PUE) 1.29
Phase 2
500kVA UPS (N+1) Electrical room
1,100kVA UPS (N+1) UPS Room
540 tons (N+1) Cooling Data Center
1,480kW (IT Loads) Data Center
9 tons (N) Cooling Electrical Room
12 tons (N) Cooling UPS Room
Power Utilization Efficiency (PUE) 1.14
Up to 3 MW of on-site power available at full build
Redundant UPS infrastructure to prevent loss of critical power
Overhead power distribution prevents interference with network infrastructure
Offered capability of 12 KW per rack at full build